<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>rancho-concrete</title>
    <link>https://www.rancho-concrete.co</link>
    <description />
    <atom:link href="https://www.rancho-concrete.co/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>Pouring Concrete During Monterey County's Rainy Season: What Changes Nov-Mar</title>
      <link>https://www.rancho-concrete.co/blogs/pouring-concrete-rainy-season-monterey-county</link>
      <description>Can you pour concrete in the rain? What changes on Monterey County jobs from November to March, and when waiting for a dry window is the right call.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           What the rainy season changes on a concrete job
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           We rarely deal with freezing in the Salinas Valley, so cold is not the main problem. Water is. It affects the soil before the pour, the surface during finishing and the schedule from week to week.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           The Ground Under the Slab
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Much of the valley sits on clay that swells when it soaks up water and shrinks as it dries. Concrete placed on saturated, soft clay loses the firm support it needs. That shows up later as cracks or low spots. A wet subgrade also can't be compacted properly, no matter how good the crew is.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           The Pour Day
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Rain during placement or finishing adds water to the surface. That weakens the top layer and can leave a dusty, flaky finish. Crews should never work rainwater into the surface to make finishing easier.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           The Schedule
          &#xD;
    &lt;/strong&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Storms on the Central Coast tend to arrive in waves, with dry stretches in between. Those dry windows are when the work gets done. A rainy-season project may take a few extra days from start to finish, even if each step stays the same.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           How rain affects fresh concrete, hour by hour
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Timing is everything once the truck arrives. Here is what rain means at each stage.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            ﻿
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Once concrete has set, steady moisture actually helps it cure. The danger window is short. That is why the forecast for pour day and the morning after matters more than the forecast for next week.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Call
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           (831) 710-7943
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            or
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;&#xD;
      
           request a free estimate
          &#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            for a straight answer on your project. Most new inquiries hear back within 30 to 60 minutes.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Ground prep on Salinas Valley clay
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Good rainy-season work starts below the concrete. On our jobs, that means a few habits that hold up whatever the weather does.
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            Excavate to firm soil.
           &#xD;
      &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Soft, wet material comes out before base goes in. If the subgrade is pumping under foot, the pour waits.
            &#xD;
        &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            Build a solid base.
           &#xD;
      &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Compacted base rock spreads the load and keeps the slab off the clay. It also drains far better than native soil.
            &#xD;
        &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            Plan the slope.
           &#xD;
      &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Every
            &#xD;
        &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
      &lt;a href="/services/concrete-driveways"&gt;&#xD;
        &lt;strong&gt;&#xD;
          
             concrete driveway installation
            &#xD;
        &lt;/strong&gt;&#xD;
      &lt;/a&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             needs a grade that carries water away from the garage and the house. Winter storms show any low spot quickly.
            &#xD;
        &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            Pump out the forms.
           &#xD;
      &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;&#xD;
          
             Standing water in forms or footing trenches gets removed before concrete is placed.
            &#xD;
        &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            The same groundwork applies to
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/services/concrete-building-pads"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            concrete building pads
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            for shops and ag buildings. Large pads on open land collect a lot of runoff, so site drainage is planned before forms are set.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Which projects fit the rainy season
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Footings and foundations often keep moving through winter because builders are on a schedule. Excavations can be pumped and protected, and the pour happens in the next dry window. Our
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/services/foundations-and-footings"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            foundations and footings
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            work for additions, garages and ADUs follows the approved plans and inspection schedule in any season.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Driveways, walkways and pads are workable between storms when the base is dry and firm. Decorative finishes are different. Colored or textured concrete patios look best when the finishing and sealing happen in dry weather, so many owners plan those for spring.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Keeping washout out of the storm drains
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Rain also carries anything left on a jobsite into the gutter. California treats concrete washout as a pollutant, and the
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            State Water Resources Control Board's construction stormwater program
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            sets the rules for larger sites. On residential jobs, the same idea applies. Washout goes into a contained area, never the street.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           How Rancho Concrete plans a rainy-season pour
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;br/&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Every project starts with a site review of access, grade, drainage and base preparation. In the rainy months, we add a close look at the
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://www.weather.gov/mtr/" target="_blank"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            National Weather Service forecast for the Monterey Bay area
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            in the days before the pour. If a storm is coming, we'll call you and move the date to the next dry window.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Plastic sheeting stays on site for every winter pour. You'll have a dedicated point of contact who keeps you updated when the weather shifts the schedule. All of our projects are backed by a 2-year warranty.
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Frequently asked questions
          &#xD;
    &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&#xD;
&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;&#xD;
      
           Talk to a Gonzales concrete contractor about timing
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Not sure whether your project should go in between storms or wait for spring? Rancho Concrete serves Monterey, San Benito and Santa Cruz counties from Gonzales. We'll look at your site, check the forecast with you and give you a straight answer. See all the
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/areas-we-serve"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            areas we serve
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      
           .
          &#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            Call
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;strong&gt;&#xD;
      
           (831) 710-7943
          &#xD;
    &lt;/strong&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            or
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;&#xD;
      &lt;strong&gt;&#xD;
        
            request a free estimate
           &#xD;
      &lt;/strong&gt;&#xD;
    &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;&#xD;
        
            to talk through your project.
           &#xD;
      &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/d38fd29b/dms3rep/multi/covering-fresh-concrete-slab-rain-gonzales-ca.png" length="3559310" type="image/png" />
      <pubDate>Mon, 02 Nov 2026 11:50:54 GMT</pubDate>
      <guid>https://www.rancho-concrete.co/blogs/pouring-concrete-rainy-season-monterey-county</guid>
      <g-custom:tags type="string">Concrete Tips</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/d38fd29b/dms3rep/multi/covering-fresh-concrete-slab-rain-gonzales-ca.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/d38fd29b/dms3rep/multi/covering-fresh-concrete-slab-rain-gonzales-ca.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
